References
List of Completed Projects
-
Abadan 4×123MW Gas turbine power plant Electrical BOP
-
Damavand (Phase #1) 6×159MW Gas power plant Electrical BOP
-
Mobin 6×123MW Gas Turbine Power Plant Electrical BOP & DCS & Substation
-
Shahrekord Cement Plant Engineering Services
-
Damavand (Phase # 2) 6×159MW Gas Turbine Power Plant Electrical BOP
-
Tehran Cement Plant 63KV Substation Equipment
-
South Isfahan 6×159MW Gas Turbine Power Plant Electrical BOP
-
Replacement of Control System for Arak Petrochemical Complex Power Plant
-
Shirvan 6×159MW Gas Turbine Power Plant Electrical BOP
-
Kazeroon 3×160MW Combined Cycle Power Plant Electrical and Mechanical BOP
-
Sanandaj 4×159MW Gas Turbine Power Plant Electrical BOP
-
Mobin Petrochemical 140T/H Deaerator DCS Control System
-
Delijan cement factory electrical system
-
Jahrom 6×159MW Gas Turbine Power Plant Electrical BOP
-
Assalouyeh 6×159MW Gas Turbine Power Plant Electrical BOP
-
Ardebil 4x159MW Gas Turbine Power Plant Electrical BOP
-
Protection Relays Replacement for Arak Petrochemical Complex Power Plant
-
Fajr Petrochemical Boilers Control System
List of Current Projects
-
PDCS of Utility for phase 15th & 16th of South Pars
-
Fars 6×160MW Gas Turbine Power Plant Electrical BOP
-
Esfahan II (2+1)×160MW Combined Cycle Power Plant Mechanical BOP
-
Parehsar 4×160MW + 2×160MW Combined Cycle Power Plant Electrical and Mechanical BOP
-
Sanandaj 4×160MW + 2×160MW Combined Cycle Power Plant Erection and Commissioning of Steam Turbines and Generators and HRSG and BOP
-
Esfahan Refinery Extension of 63/20 KV Substation
-
Iran LNG Power & Steam Complex Electrical BOP
-
Semnan 4×160MW Gas Turbine Power Plant Electrical BOP
-
Extension of Mobin 2×159MW Gas Turbine Power Plant SUBSTATION
-
South Pars Gas Complex 132/33/6.6 KV Substation
-
Pars 4×160MW Gas Turbine Power Plant Mechanical BOP
-
Lawan Swithgear Renovation of Salman Power Plant
-
SIRI connection of new Power Plant with older one & Improvement of Energy through region
-
Besat Thermal Power Plant Protection System Retrofit
-
Besat Thermal Power Plant Excitation System Retrofit
-
Ali Abad 6×160MW Power Plant Electrical BOP
-
Amir Abad 2×25 MW Gas Turbine Power Plant (MC)
-
Sarakhs (2+1)×160MW Combined Cycle Power Plant (Turn Key)
-
South Pars 6x160MW Gas Turbine Power Plant Electrical BOP
-
Genaveh (2+1) 160MW Combined Cycle Power Plant Mechanical BOP
-
Pars 2×160MW Gas Turbine Power Plant Mechanical BOP
-
Extension of Akhtar 132/33kV Substation
-
Construction of 33kV Razi Substation
Mobin Combined Steam & Power Plant (Heat Recovery Steam Generator).
Arak petrochemical Complex.